[0.5.6*] Hawkethorne Nursery construction doesn't build a stage

Xynissen

Active Member
Apr 15, 2019
25
1
36
At the Hawkethorne Nursery, the donation stage to build a laundry room for the nursery doesn't function correctly. The construction triggers but when it completes, nothing has changed. Further electrum donations to Gwyn allow you to move on to the next stage by increasing the size of the building.

I am including saves before and after triggering the supposed laundry construction.

Opera Version 89.0.4447.48
 
Last edited:

Xynissen

Active Member
Apr 15, 2019
25
1
36
As of [0.5.7] this bug is still in effect. Purchasing the third nursery upgrade takes electrum and triggers construction with nothing changed as of completion.

Using Opera Version 89.0.4447.48

I've included sequential screenshots of each phase of the construction process on the [Look Around] screen.
 

Attachments

  • Pre-construction 1.png
    Pre-construction 1.png
    945.3 KB · Views: 6
  • Pre-Construction 2.png
    Pre-Construction 2.png
    117.9 KB · Views: 6
  • Construction 1.png
    Construction 1.png
    912.9 KB · Views: 7
  • Construction 2.png
    Construction 2.png
    464 KB · Views: 7
  • Construction Complete.png
    Construction Complete.png
    217.3 KB · Views: 6
  • Post-Construction 1.png
    Post-Construction 1.png
    889 KB · Views: 5
  • Post Construction 2.png
    Post Construction 2.png
    110.5 KB · Views: 6

Listo

Well-Known Member
Aug 19, 2023
207
226
This is still a problem (for me at least) almost 2 years later